BEFORE THE SOLE ARBITRATOR SH. B.L.
SINGAL; GURGAON,
HARYANA
Arbitration Case No. ____ OF
2016.
In the matter of Arbitration between:
______________ CLAIMANT
VERSUS
_____________ RESPONDENT
REPLY
ON BEHALF OF THE CLAIMANT TO THE COUNTER CLAIM FILED BY THE RESPONDENT.
MOST RESPECTFULLY SHOWETH:
-
PRELIMINARY
OBJECTIONS:-
1. That the allegations, submissions,
contentions in the counter claim raised by the respondent are untenable, false,
bogus and are denied. No sums are due and owing to the respondent as claimed or
otherwise. The respondent is obfuscating issues to mischievously avoid his
liabilities.
REPLY TO PRELIMINARY SUBMISSIONS
1-2. That
the contents of paras 1-2 of the preliminary submissions are wrong and denied. It
is denied that the claim filed by the claimant is totally false, baseless,
vague and is based upon fake and forged bills and upon the bills which pertain
to the work which was never assigned to the claimant by the respondent.
3. That the contents of para 3 of the preliminary submissions are
wrong and denied. It is denied that the claimant has filed three separate
claims against three different sister concerns of the respondent company and
has intermingled the bills of work of these companies in these claims thereby rendering
these claims as suspicious. It is submitted that claim of the claimant is only
concerned to M/s ___________ _________ is not intermingled with any other
concern of __________. Although, the claimants are in legal tussle of
receivable payments with other companies of M/s ___________.
4. That the contents of para 4 of the preliminary submissions are
wrong and denied. It is denied that the whole claim of the claimant is based on
such irrelevant and baseless invoices which clearly prove the falsity of the
claim of the claimant and the malafide intentions of the claimant to mislead
the Tribunal and therefore the claim of the claimant is liable to be
dismissed. The Invoice no. ___________
is explainable legitimate the claimant is being enclosing herewith the copy of
invoice as cited, duly verified by the resident project manager of ______________Limited
– _________. Also, be point out that P.O. no. being mentioned in the referred
invoice i.e. ________ is in accordance to P.O. Further, claimant has also received
the’____’ Form bearing no. ___________ dtd __________ against the mentioned
invoice, which clarifies he acceptance of invoice by __________. Similarly,
invoice no. ____________ being denied by respondent is legitimate in all
respect. The copy of P.O. vide ref. no. _________ dtd. ___________ pertaining
to the said invoice and also referred in the same invoice is being enclosed for
reference of the respondent. It is submitted that Invoice ___________ are
legitimate and in accordance to the issued Purchase Order. There had been a
discrepancy in noting of P.O. number in the referred invoice but it was purely
typology error and has not discrepancy in relation to statutory such as Party
Name, values or taxes. The material was dispatched and receipted at site and in
binding __________ has also issued us ‘C’ Form bearing no. _______dtd __________.
Henceforth, the invoices are legitimate.
REPLY
ON MERITS:-
1. That
the contents of para 1 of the counter claim are reiterated, hence denied. It is
submitted that the present counter claim not signed and filed by the competent
person of the respondent company.
i). That
the contents of para 1 of sub para (i) of the counter claim are absolutely
wrong, incorrect and reiterated, hence specifically denied. It is denied that the
respondent had obtained the services of claimant vide various purchase/work
orders but the claimant's work/services were very poor from the very inception,
Claimant's way of working was of sub-standard and not up to the mark as per the
established standards of the industry. It is further denied that the material
supplied by the Claimant was also below standard and not in conformity to the
purchase order issued to the Claimant. It is also denied that as per the
Purchase order issued to the Claimant, the Claimant \ had to supply Structured
Steel of _________ \ BRANDS but the Claimant failed to adhere this and instead
supplied this material of local/other unspecified brands. It is further denied
that the claim of the Claimant is based on unverified bills/quantity of
material supplied though it was mandatory for the Claimant to get the bills of
material & services verified from the project manager of the respondent but
the claimant failed to comply the said requirement. It is further denied that this
issue of supply of local/other unspecified brand material was raised by the
respondent and after a lot of persuasion, claimant admitted the fact of supply
of material of different brand than agreed in P.O. and further agreed to issue
credit note @ Rs_________ Kg. but never credited this amount to Respondent. It
is further denied that the respondent is entitled to recover an amount of Rs.
__________/- on this account. It is admitted that claimant accepted the credit
note of Rs.______/-.
ii). That
the contents of para 1 of sub para (ii) of the counter claim are absolutely
wrong, incorrect and reiterated, hence specifically denied. It is denied that the
claimant was bound to get the material
inspected from the authorized
representative of the Respondent before dispatch of material as per the "inspection"
clause of the Purchase Order but
claimant completely failed to adhere the same and supplied the material without affording any opportunity to
respondent to inspect die same. It is further denied that the said inspection
was never waived-off by the respondent in this way the claimant supplied uninspected sub-standard material to
the respondent which caused huge bearing on the project which in turn harmed
the respondent financially besides causing loss of reputation. The statement is
totally baseless. It would have been complete rejection against the supply of
first consignment to site if the case was no inspection basis. Always there had
been verbal inspection discussions with concerned officials of ÂÂÂÂÂÂÂÂ_______ and
due to urgency of project executions were always asked to dispatch the material
at site. Never ever, neither post receipt of material at site nor in any
communication there had been any concerns of inspection.
iii) That
the contents of para 1 of sub para (iii) of the counter claim are absolutely
wrong, incorrect and reiterated, hence specifically denied. It is denied that the claimant failed to supply the material in
exact confirmation of the bills raised by him i.e. the material supplied by him
was short as described/detailed in his invoices. It is further denied that the
claimant is liable to refund the amount equivalent to the value of short
quantity which comes to Rs________/-. The matter
being represented in relation to difference in weights is totally false and
baseless. The matter was never brought in knowledge of any Mannschaft
personnel, either by e-mail or even to the site in charge of claimant regarding
shortage material supply. The weighment slips being now annexed by _____ is
their internal property and had never been shared / or communicated to the
claimant in the past.
iv) That
the contents of para 1 of sub para (iv) of the counter claim are absolutely
wrong, incorrect and reiterated, hence specifically denied. It is denied that as per the terms and conditions of the
purchase order, the claimant had to supply the complete material within two months
of the date of purchase order but the claimant also failed to supply the
material within the stipulated time frame and whatever material was supplied by
him, was unverified/uninspected & short. It is further denied that the
claimant totally failed to supply the material as per the purchase order which
on one hand delayed the project of the respondent and on other hand also
affected the quality & strength/durability of structures of the project. It
is also denied that as per the Clause 12 of Purchase Order, the respondent is
entitled to recover Liquidated Damages from the claimant to the tune of Rs. _____________/-.
The para being raised by ________ Infra is totally frivolous. The delay in
execution of the project whatever pertained has always been on account of _________
non-payments and irregularities. The same was communicated to them through
various mails that had been annexed in the claim of the claimant.
v) That
the contents of para 1 of sub para (v) of the counter claim are absolutely
wrong, incorrect and reiterated, hence specifically denied. It is denied that the
Respondent asked the Claimant several times not to supply the sub-standard material
and made the Claimant understand that the said material was to be used in Solid
Waste Management Project which infact was a prestigious project of the Central
& State Government implemented as per the direction of Hon'ble Supreme
Court and therefore the Respondent was not in a position to compromise over the
quality of material used in this project, but the Claimant was not ready to
understand the seriousness of the situation and continued with his hostile
attitude. It is further denied that the respondent also asked the claimant to
supply the complete quantity of material as per the Purchase Order and that too
within the stipulated time frame but to no use. It is also denied that the
claimant failed to supply the complete quantity of material and due to this
short fall in material, respondent had to procure this short material from
other vendors that too on higher rates in the situation of exigency because it
was a prestigious project for the respondent and respondent wanted to complete
it at any cost and in this way the respondent has suffered huge financial
losses besides mental harassment. The para of use of sub standard material is
totally baseless. The use of alternate make of material was agreed upon
mutually considering non-availability of desired makes and keeping in mind the
execution intact. Also, the reduced price of INR ___/- was result of mutual
discussions, as referred in para no. (i).
vi) That
the contents of para 1 of sub para (vi) of the counter claim are absolutely
wrong, incorrect and reiterated, hence specifically denied. It is denied that apart
from the purchase order, the respondent had also entrusted a work order upon
the claimant and the said contract regarding Civil Work was also time bound
i.e. time was the essence of the contract i.e. the claimant was bound to
complete the Civil Work within 100 days from the date of work order but the
claimant was not able to arrange the sufficient man power / labour which was
necessary to execute the ongoing project which ultimately harmed the respondent
financially besides causing delay in execution of the project. It is further
denied that respondent asked the claimant several times to improve his working
but to no use due to this continued scenario, work was totally halted at
several occasions. It is also denied that vide email dated _____ the respondent
requested the claimant to arrange for a panting team to paint the structured
steel before erecting the same and again reminded vide email dated ________ to
arrange the team for painting of steel structure otherwise it will be difficult
to paint the structure after erection but the claimant did not bother to the
request of the respondent. The para being raised by _______ Infra is totally
frivolous. The delay in execution of the project whatever pertained has always
been on account of __________ non-payments and irregularities. The same was
communicated to them through various mails that had been annexed in claim of
the claimant. The delay was purely in relation to delayed payments from ________
end.
vii) That
the contents of para 1 of sub para (vii) of the counter claim are absolutely
wrong, incorrect and reiterated, hence specifically denied. It is denied that due to the deficient work rendered by the claimant and continues delay
in execution of the work,
respondent was under constant pressure to complete the work in time and
therefore the respondent warned the claimant several times to complete the work
in time but no fruitful results emerged and the claimant continued with his
hostile attitude towards the assigned work. It is further denied that it that
vide E-mail dated _______, the respondent wrote to the Claimant "as
discussed on telephonic several times and with reference to the trailing mails
for engage of extra team/manpower for the speed up of erection work, still no
response is getting from your side. Kindly note that we have started the
erection work of pre-sorting shed from last month back (inc. all disputes) but
still the work is not completed, your vendor has engaged only 07 persons. As
per your working criteria, you are taking one month for completing one shed,
its means we required next 04 months to complete the overall job. Again
requested to please arrange your extra team by today itself at any cost, for
speed up of the work. It is further denied that the respondent again warned
of the same situation vide E-mail dated _______. Further Vide E-mail dated _________,
the respondent wrote to the claimant "with reference to the telephonic
discussion with you have regarding the welding of extra based plate for shed
numbers 10, 10a, 14, 14a for structural columns, kindly arrange the same by
today itself otherwise your labour will be sitting idle. Apart from this, still
your new contractor for structural steel erection not started the work due to
lack of hydra, electricity, LPG, oxygen etc. / am not understanding that how
you are managing your contractor. Kindly revert me back asap." It is
also denied that the delay in execution of work & poor speed of work was
further explained to Claimant vide various E-mails, vide email dated ________,
the respondent informed the claimant about not supplying the balance structure
material for final compost section and monsoon shed and further informed the
claimant about the pendency of painting of steel structure and requested to
arrange the team for the same. it is further denied that vide this mail, the
respondent further informed the claimant that erection of structure for
pre-sorting, RDF, inert processing shed was not up to the mark and about the
discontinuation of the work since last 25 days and other problems regarding the
slow pace of the work. It is also denied that vide another email dated _________,
the respondent informed the claimant about the poor work progress, again vide
email dated ______, the respondent reminded about the slow pace of civil as
well as mechanical work which was due to the payment dispute of claimant with
his sub-contractors. It is further denied that vide this email, the respondent
again raised the old issues which the claimant had failed to resolve despite
repeated requests and reminders of the respondent. It is also denied that the
Claimant failed to improve the pace of work resulting into idling of manpower
and this fact is evident from mail dated _______. It is further denied that due
to incomplete supply of material as per purchase order, delay, poor quality
work of claimant and idling of manpower, respondent had to bear all additional
costs pertaining to labour’s wages, rent of hired machineries administrative
cost, etc. etc. on his own, only due to the abovementioned defaults on the part
of the claimant and respondent has suffered to the tune of Rs._______ for above
mentioned causes which the respondent is entitled to recover from the claimant.
The para is already replied with in above. Respondent has referred e-mail dated
______ and the claimant replied to para with governed action on ______ (copy
enclosed). Likewise, respondent e-mail dated _____ was replied immediately
mentioning the pending payments matters (copy enclosed). Likely, respondent’s email
dated ______ was replied by claimant after wait until _____, similarly
pertaining matter to non payments.
viii) That
the contents of para 1 of sub para (viii) of the counter claim are absolutely
wrong, incorrect and reiterated, hence specifically denied. It is denied that due to above mentioned delay in
execution of work order
substandard work rendered
by the claimant the project of the respondent delayed of more
than six months which includes
the time spent in getting the
work done/completed from another vendor. It is further denied that due
to this delay of more than 6
months, the respondent could not
start the production of Compost
& RDF and consequently incurred loss of earnings on account o\ loss of production to the tune
of R.s.________/- as profit. It is also
denied that the claimant seeks damages for business losses for a period of 1
months only sub sequent to the stoppage of operations by the claimant and states that the same are
actual and directly emerge from the defaults of the claimant. The para is
frivolous and unjustified.
ix) That
the contents of para 1 of sub para (ix) of the counter claim are absolutely
wrong, incorrect and reiterated, hence specifically denied. It is denied that the
respondent is also entitled in recovery liquidated damages in the tune of Rs. _____/-
from the claimant for aforementioned delay caused by claimant as per clause 12
of work order. The para is frivolous and unjustified.
x) That
the contents of para 1 of sub para (x) of the counter claim are absolutely
wrong, incorrect and reiterated, hence specifically denied. It is denied that the
claimant was legally bound to deposit labour cess to the government to the tune
of 1% of the total value of work order and purchase order which comes to Rs. ________/-
but the claimant ignored the same despite repeated requests by the respondent.
It is further denied that the respondent itself has to deposit the said labour
cess to the concerned authorities and therefore suffered loss of Rs. ________/-
which amount is legally recoverable from the claimant. It is further denied
that the claimant has also failed to produce any documents with regard to
labour compliances like ESIC/PF/Insurance etc. in utter violations of clause
no. of the work order. It is also denied that the claimant has also failed to
produce on record any labour licence in its favour by the competent labour
authorities. The deposit of labour cess is purely _____ liability. The annexure
letter referred is addressed in the name of _____ Infra and was never ever
brought in knowledge of claimant ever. Also, there is no reference of the
matter in statutory taxes in the Purchase Order. It would have been virtually
impossible for claimant– MIIPL to work at site without labour policy or
compliance to statutory like ESI / PF etc. Neither claimant could have
initiated work nor _____ could employ such contractor. Claimant’s sub
contractor – Peru Builders was a resident sub contractor to ____ team on the
similar site for various other works and they have provided all statutories to ____
and then initiated work on account of ____-. Also, an e-mail dated -__________
(copy enclosed) pertaining to scanned copy of workman insurance policy is
enclosed.
xi) That
the contents of para 1 of sub para (xi) of the counter claim are absolutely
wrong, incorrect and reiterated, hence specifically denied. It is denied that
the services rendered by the claimant to other group companies of respondent
are also deficient and below specified standards due to which these group
companies have also suffered huge financial losses besides mental harassment. The
claimant has outstanding payments and statutory with other companies of M/s A2Z
Group and they are being trialed in court separately.
xii) That
the contents of para 1 of sub para (xii) of the counter claim are absolutely
wrong, incorrect and reiterated, hence specifically denied. It is denied that besides above mentioned
financial losses, Respondent has also suffered on account of loss of reputation
& goodwill, mental & physical harassment etc. solely due to the lackluster
approach of claimant towards his liabilities entrusted upon him through
purchase/work order and therefore the claimant is liable to compensate the
respondent for all these losses to the tune of Rs._____/-.
xiii) That
the contents of para 1 of sub para (xiii) of the counter claim are absolutely
wrong, incorrect and reiterated, hence specifically denied. It is denied that there
are numerous defaults/violations on the part of Claimant due to which the
Claimant failed to complete the works within the stipulated time and further
failed to supply the requisite materials i.e. the Claimant failed in totality
to complete the assigned work which have caused numerous losses to the
Respondent as detailed above.
xiv) That
the contents of para 1 of sub para (xiv) of the counter claim are absolutely
wrong, incorrect and reiterated, hence specifically denied. It is denied that despite
all the above mentioned facts regarding the failure of Claimant to properly
execute the order of supply & works, the Respondent has paid an amount of
Rs. __________/- (Rupees ___) to the Claimant till date and the Respondent is
also legally entitled to recover these amounts from the Claimant
======
4. That
the contents of para 4 of the counter claim are absolutely wrong, incorrect and
reiterated, hence specifically denied. It is denied that finding no way out and
to save its projects, the respondent had to buy those material / machines from
another vendor namely M/s. ___. for replacing the defective material / machines
supplied by the claimant, this was a huge financial burden upon the respondent.
It is further denied that debit notes worth Rs. ______/- were issued to the
claimant to compensate the losses suffered by respondent in purchase of above
said material from M/s. ______ Conveying Systems Pvt. Ltd. & other vendors.
5. That
the contents of para 5 of the counter claim are absolutely wrong, incorrect and
reiterated, hence specifically denied. It is denied that due to the deficient
work rendered by the claimant and continues delay in execution of the work,
respondent was under constant pressure from _____________. to complete the work
in time and therefore the respondent warned the claimant several times to
complete the work in time but no fruitful results emerged and the claimant
continued with his hostile attitude towards the assigned work.
6. That
the contents of para 6 of the counter claim are absolutely wrong, incorrect and
reiterated, hence specifically denied. It is denied that the services rendered
by the claimant to other group companies of respondent are also deficient &
below specified standards due to which these group companies have also suffered
huge financial losses besides mental harassment. It is further denied that
those losses are yet to be assessed and shall be brought on record at the
earliest.
7. That
the contents of para 7 of the counter claim are absolutely wrong, incorrect and
reiterated, hence specifically denied. It is denied that due to deficient and
delayed work rendered by the claimant, respondent had to bear all additional
costs pertaining to Idling charges, labour’s wages, rent of hired machineries
and administrative cost etc. etc. on his own, only due to the abovementioned
defaults on the part of the claimant and therefore the claimant is solely liable
to compensate the respondent for that.
8. That
the contents of para 8 of the counter claim are absolutely wrong, incorrect and
reiterated, hence specifically denied. It is denied that besides above
mentioned financial losses, respondent has also suffered on account of loss of
reputation and goodwill, mental and physical harassment etc solely due to the
lackluster approach of claimant towards his liabilities entrusted upon him
through purchase order and therefore the claimant is liable to compensate the
respondent for all these losses.
9. That
the contents of para 9 of the counter claim are absolutely wrong, incorrect and
reiterated, hence specifically denied. It is denied that as on date, the ledger
of the respondent shows a debit balance of Rs. _______/- i.e. the respondent is
entitled to recover Rs. _______/- from the claimant for which the respondent is
filing present counter claim.
10. That
the reply to counter claims are as under;-
A. That
the contents of sub para A of the claim- ledger balance are absolutely wrong,
incorrect and reiterated, hence specifically denied. It is denied that the
respondent is legally entitled to recover Rs._____/- being amount due against
the claimant as per ledger.
B. That
the contents of sub para B of the claim-idling charges are absolutely wrong,
incorrect and reiterated, hence specifically denied. It is denied that Rs._____
being amount incurred by respondent against additional costs pertaining to
labour’s wages, rent of hired machineries, administrative cost etc. which the
respondent incurred on account of idling of manpower and machinery due to halt
of work on several occasions which occasioned due to the faulty and substandard
material supplied by the claimant.
C. That
the contents of sub para C of the claim-mental pain & harassment are
absolutely wrong, incorrect and reiterated, hence specifically denied. It is
denied that respondent is entitled to recover of ______ for mental pain and
harassment suffered by respondent in the hands of the claimant.
D. That
the contents of sub para D of the claim-loss of goodwill and reputation are
absolutely wrong, incorrect and reiterated, hence specifically denied. It is
denied that the respondent has suffered loss of reputation and goodwill in the
marker especially in the eyes of ____ and the claimant is liable to compensate
the respondent for the same to the tune of ____.
E. That
the contents of sub para E of the claim-litigation cost are absolutely wrong,
incorrect and reiterated, hence specifically denied. It is denied that respondent
is also entitled to recover and Rs._____ as litigation cost incurred by
respondent solely due to the claimant.
F. That
the contents of sub para F of the claim-interest are absolutely wrong,
incorrect and reiterated, hence specifically denied. It is denied that the
claimant is liable to pay interest @____. on the above mentioned total claim
amount of Rs.______/- till final adjudication of the case.
It
is submitted that the respondent is not entitled to get any relief by way
counter claim from the Hon’ble Arbitrator.
Prayer clause along with its sub paras of the counter claim are
absolutely wrong and specifically denied. The respondent is not entitled to the
relief claimed for.
It is therefore most respectfully
prayed that the counter claims of the respondent may kindly be dismissed and relief
may kindly be granted in favour of the claimant as prayed in the statement of
the claimant, in the interest of justice, equity and circumstances of the case.
Pass
such further order or orders as this Hon’ble Court may deem fit and proper of
the facts and circumstances of the case, in the interest of justice.
It
is prayed accordingly.
CLAIMANT
DELHI THROUGH
DATED
_______________
ADVOCATE
____________
New
Delhi-110013.
BEFORE THE SOLE ARBITRATOR SH. B.L.
SINGAL; GURGAON,
HARYANA
Arbitration Case No. ____ OF
2016.
In the matter of Arbitration between:
____________ CLAIMANT
VERSUS
________________ RESPONDENT
AFFIDAVIT
Affidavit of __________, about ___ years, Director of M/s. ____________, New Delhi-110028, do hereby solemnly affirm and declare as under: -
1. That
I am the Director of claimant company and I am conversant with the facts and
circumstances of the present case and as such am competent to swear this
affidavit.
2. That
the accompanying reply to the counter claims has been drafted under my
instructions, which has been read and understood by me and I say that the
contents of the same are true and correct.
DEPONENT
VERIFICATION
:-
Verified at Delhi on this ____, day of
_________ that the contents of paras of the above affidavit are true and
correct to my knowledge. No part of it is false and nothing material has been
concealed therefrom.
DEPONENT